mrydel wrote:OK, Calallen, you are up. I need a report. You can just verify for me. If what I am finding is correct, there will be a lane closing in Rockwall County and some slow down in the Garland area also but the Interstate should be open all the way through. I just need to be sure there is not going to be a complete shut down again. Thanks.
I have that as well. Specifically, here's what I have from the state's website:
District:
County:
Condition:
Roadway:
Direction:
Time:
Limits: Dallas
Rockwall
Construction
IH0030
Eastbound
2011-09-12 7:00 AM to 2011-09-17 3:30 PM
SH 205 to FM 3549
Description: Right lane closed.
Closing one right Lane of a two lane interstate for moving rail for traffic switch. Watch for flagging personnel. Watch for workers and slow moving traffic throughout the closure. (Delay)
District:
County:
Condition:
Roadway:
Direction:
Time:
Limits: Dallas
Rockwall
Construction
IH0030
Westbound
2011-09-12 9:00 AM to 2011-09-17 5:00 PM
SH 205 to Fm 3549
Description: Right lane closed.
Closing one right lane of a two lane roadway Main lanes for moving rail for traffic switch. Watch for flagging personnel. Watch for workers and slow moving equipment throughout the lane closure. (Delay)
District:
County:
Condition:
Roadway:
Direction:
Time:
Limits: Paris
Hunt
Construction
IH0030
Eastbound
2010-11-08 8:00 AM to 2011-10-01 5:00 PM
SH 34 to Hopkins County Line
Description: Alternating lanes closed.
Alternating lane closures during daytime hours because of milling operation. Various ramp closures from US 69 to Hopkins County line. Use caution and expect delays. Work will be suspended from Dec. 23rd until Jan. 3rd for the holidays. (Delay)